Polymer Compound Self-adhesive Waterproofing Membrane

EL-P100

EL-P100 waterproofing membrane consists of self-adhesive bitumen glue and polymer composites film on top, such as HDPE, LDEP, CPE, EVA, and EPDM. Different construction methods can be allowed according to different design demands

 

PRODUCT FEATURES

1.         Can solve many construction difficulties, and reinforce the weakness of modified self adhesive rubber bitumen waterproof membrane, which has realized the superposed waterproof function.

2.         Excellent tension strength, effective stop the puncture of roots.

3.         Superior self-adhering and leak-proof property, effective stop water running between different layers..

4.         Good performance of resistance to acid, alkali and other chemical medium.

5.         Self-healing capability, good puncture resistance and high elongation.

6.         Easy to apply, efficient and save cost.

7.         Non toxin and environmental friendly.

 

SCOPE OF APPLICATION

Planted roofs or basement, granaries, air-raid shelters, sewage treatment plants, man-made lakes, basements, tunnels, railways, bridges, refuse landfill and so on.

 

APPLICATION PROCESSES

1.         Pre-laid Method:

Base level processing -> Detail place Processing -> Pre-laid the membrane -> Joints and corners   treatment -> Peel off the isolation film -> concreting

2.         Wet Apply Method:

Base level processing -> Mixing cement as glue-> Detail place processing-> Pave the membrane ->

Joints and corners treatment -> Sealant processing


NOTES

1.         Construction workers should wear soft shoes while applying. Wandering on the membranes is not allowed.

2.         Better scatter a little cement powder for easier construction after peeling off the isolation film.

3.         Inspection is required after the connecting joint construction, if there is any damage, need to deal with in time.

4.         Pay attention to the protection of waterproof layer (membrane) while banding steel or concreting.

5.         Pay attention to the proportion while mixing the cement glue.

6.         Avoid cement polluting the joints before connecting.

7.         No steps on membranes within 48 hours until the membranes sticking tightly to the base surface.

 

 

 

PACKING, TRANSPORTATION AND STORAGE

1.         Membranes should be stored separately. Keep membranes dry and ventilated, protected from sun and rain. Store temperature should between 5-45℃.

2.         One layer up-right storage in warehouse, no more than 2 layers up-right during transportation.

3.         Prevent it from inclination or lateral pressure. If necessary, cover it with felt-cloth.

4.         Storage period: 1 year under normal operation of storage.

 


扫描二维码分享到微信